Know How
Selection of location / land based on feasibility study
Connecting the electricity network (Electrical or Transelectrica);
Distance of 400m from any county road, communal or built;
Availability of capacity connection - ISPE preliminary study;
Solving problems of Urban and Environmental Protection;
Operational access roads
Land Use: concession / rental, association, purchase or rental.
Urbanism Certificate in pre-feasibility stage
(with the obvious conditions of planning, environment, network, PUD, PUZ)
Wind measurements (on a tower 60m minimum)
(company certified according to IEC1400)
Construction permit involves:
Limited connection resources. On the basis of the obtained ATR;
Environmental Agreement - in the study of Environmental Impact Assessment (EIA) with the public (very important);
Urban Plan (PUZ) approved on RCP, an environmental and Opinions (electric, water, gas ...);
Authorization for Construction Project (CAP);
Topographic Survey and Geodesy Study (per generator);
Electrical opinion, Romanian Waters, SIE, SMG;
Romanian Aeronautical Authority notice.
Project execution details (DDE)
Agreement Transelectrica energy drain network
Production license to the National Regulatory Authority (ANRE)
Based Application Project, Technical Report and Business Plan
Purchase equipment and materials
Making wind farm
Network connection and operation